Can someone help me with dispatching the load or how to add a solar to
power generation to limit the voltage violations.Following are the
objectives:
I want to Run 24-‐‑hour simulations and report the voltage, losses and
line loading. If the voltage violates the standard limits of 0.95 PU – 1.05
Bus Standard Test Feeder for 24 hours. Using 15-‐‑minute or 1-‐‑hour
intervals, the model
needs to run every time step (i.e., 96 or 24) and calculate optimal set
points for the
scheduled generation and dispatchable loads. We will primarily monitor the
voltage
magnitude and losses at each bus,
How do you run a 30 Bus Standard Test Feeder for 24 hours. Using
15-‐‑minute or 1-‐‑hour intervals, the model
needs to run every time step (i.e., 96 or 24) and calculating optimal set
points for the
scheduled generation and dispatchable loads.
Can someone give me an Idea about it?
Regards
On