Question on MATPOWER program....please reply to this email address.

2018-04-21 Thread Khawla Munawwer
Can someone help me with dispatching the load or how to add a solar to power generation to limit the voltage violations.Following are the objectives: I want to Run 24-­‐‑hour simulations and report the voltage, losses and line loading. If the voltage violates the standard limits of 0.95 PU – 1.05

Simulate opf for 24 hours in matpower

2018-04-16 Thread Khawla Munawwer
Bus Standard Test Feeder for 24 hours. Using 15-­‐‑minute or 1-­‐‑hour intervals, the model needs to run every time step (i.e., 96 or 24) and calculate optimal set points for the scheduled generation and dispatchable loads. We will primarily monitor the voltage magnitude and losses at each bus,

Re: DC State estimation in matpower

2018-04-15 Thread Khawla Munawwer
How do you run a 30 Bus Standard Test Feeder for 24 hours. Using 15-­‐‑minute or 1-­‐‑hour intervals, the model needs to run every time step (i.e., 96 or 24) and calculating optimal set points for the scheduled generation and dispatchable loads. Can someone give me an Idea about it? Regards On