[ 
https://issues.apache.org/jira/browse/ACCUMULO-2914?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Josh Elser resolved ACCUMULO-2914.
----------------------------------

    Resolution: Fixed

> Move ReplicationTest into an IT
> -------------------------------
>
>                 Key: ACCUMULO-2914
>                 URL: https://issues.apache.org/jira/browse/ACCUMULO-2914
>             Project: Accumulo
>          Issue Type: Task
>          Components: replication, test
>            Reporter: Josh Elser
>            Assignee: Josh Elser
>            Priority: Trivial
>             Fix For: 1.7.0
>
>
> [~ecn] asked me if I can move ReplicationTest into something that will run at 
> integration-test time instead of unit-test time.
> I had made ReplicationTest (and intentionally left it running during unit 
> tests) to catch any regressions that I may inadvertently add while I was 
> still doing development. Since the initial feature-set is complete, it likely 
> doesn't need to be run as a part of every build anymore (since it does still 
> start up a single MAC per test).



--
This message was sent by Atlassian JIRA
(v6.2#6252)

Reply via email to