Re: [Nut-upsuser] Controlling outlets

2023-06-15 Thread Jim Klimov via Nut-upsuser
Unfortunately it is vague, at least on the NUT side, since it really depends on capabilities of particular hardware (and then on who coded what in NUT drivers and mapping tables). Often this level of precision is not available or manageable externally at all, NUT or not (e.g. WebUI of an UPS might

[Nut-upsuser] Controlling outlets

2023-06-15 Thread Prometheus via Nut-upsuser
I have a TrippLite UPS and am trying to control the sequence of which loads/outlets turn on after a simulated shutdown what would i need to configure to achieve this? The documentation is pretty vague about this matter ___ Nut-upsuser mailing list

Re: [Nut-upsuser] Controlling Outlets on UPS

2023-04-12 Thread Jim Klimov via Nut-upsuser
This normally depends on two things: vendor MIB allowing such control over SNMP at all (e.g. "write this number to this OID to set the load-delay timer for this outlet"), and someone having added and tested such mapping to NUT common data-point naming (in a relevant *-mib.c subdriver). So here

Re: [Nut-upsuser] Controlling Outlets on UPS

2023-04-11 Thread Manuel Wolfshant via Nut-upsuser
On April 12, 2023 12:34:19 AM GMT+03:00, Steve Bradford via Nut-upsuser wrote: >I have a Tripp Lite UPS and I have a configuration switch on one load and >the PC plugged into the other load of the UPS is there any way to control >the outlets of the UPS using NUT to allow the load the Switch

[Nut-upsuser] Controlling Outlets on UPS

2023-04-11 Thread Steve Bradford via Nut-upsuser
I have a Tripp Lite UPS and I have a configuration switch on one load and the PC plugged into the other load of the UPS is there any way to control the outlets of the UPS using NUT to allow the load the Switch is one to turn on before the PC load? I keep playing around with cloner drivers but they