[ https://issues.apache.org/jira/browse/OAK-6065?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Davide Giannella closed OAK-6065. --------------------------------- Bulk close for 1.7.3 > Rework CheckpointTest and MergeTest after introducing the scheduler > -------------------------------------------------------------------- > > Key: OAK-6065 > URL: https://issues.apache.org/jira/browse/OAK-6065 > Project: Jackrabbit Oak > Issue Type: Task > Components: segment-tar > Reporter: Andrei Dulceanu > Assignee: Andrei Dulceanu > Priority: Minor > Fix For: 1.8, 1.7.3 > > Attachments: OAK-6065-02.patch, OAK-6065.patch > > > Replacing the commit semaphore with the scheduler in OAK-4122, made some > tests in {{MergeTest}} and {{CheckpointTest}} obsolete, since they made use > of implementation details now unavailable in the segment store. These > concerns, like {{maximumBackoff}} and {{checkpointsLockWaitTime}} are now > configurable in {{LockBasedScheduler}}. For the moment, the tests should be > changed to work with the current scheduler, but in the future, with the > introduction of new scheduler types, they might become obsolete as well. -- This message was sent by Atlassian JIRA (v6.4.14#64029)