This is the report of the make report.
Any suggestions on how to procede would be great.

OpenSSL self-test report:

OpenSSL version:  0.9.5
Last change:      PKCS7_encrypt() was adding text MIME headers twice beca...
Options:          no-asm
OS (uname):       dgux hostname R4.20MU03 generic AViiON PentiumPro
OS (config):      AViiON-dg-dgux
Target (default): dgux
Target:           dgux-R4-x86-gcc
Compiler:         gcc version 2.7.2 (ix86 DG/ux, DG-2.7.2.9, Feb  3 1998)

Failure!
-----------------------------------------------------------------------------
testing...
        ./destest
Doing cbcm
Doing ecb
Doing ede ecb
Doing cbc
Doing desx cbc
Doing ede cbc
Doing pcbc
Doing cfb8 cfb16 cfb32 cfb48 cfb64 cfb64() ede_cfb64() done
Doing ofb
Doing ofb64
Doing ede_ofb64
Doing cbc_cksum
Doing quad_cksum
input word alignment test 0 1 2 3
output word alignment test 0 1 2 3
fast crypt test 
        ./ideatest
ecb idea ok
cbc idea ok
cfb64 idea ok
        ./shatest
test 1 ok
test 2 ok
test 3 ok
        ./sha1test
test 1 ok
test 2 ok
test 3 ok
        ./md5test
test 1 ok
test 2 ok
test 3 ok
test 4 ok
test 5 ok
test 6 ok
test 7 ok
        ./hmactest
test 0 ok
test 1 ok
test 2 ok
test 3 ok
        ./md2test
test 1 ok
test 2 ok
test 3 ok
test 4 ok
test 5 ok
test 6 ok
test 7 ok
        ./mdc2test
pad1 - ok
pad2 - ok
        ./rmdtest
test 1 ok
test 2 ok
test 3 ok
test 4 ok
test 5 ok
test 6 ok
test 7 ok
test 8 ok
        ./rc2test
ecb RC2 ok
        ./rc4test
test 0 ok
test 1 ok
test 2 ok
test 3 ok
test 4 ok
test 5 ok
test end processing ....................done
test multi-call ....................done
        ./rc5test
ecb RC5 ok
cbc RC5 ok
        ./bftest
testing blowfish in raw ecb mode
testing blowfish in ecb mode
testing blowfish set_key
testing blowfish in cbc mode
testing blowfish in cfb64 mode
testing blowfish in ofb64
        ./casttest
ecb cast5 ok
This test will take some time....123456789ABCDEF ok
        ./randtest
test 1 done
test 2 done
test 3 done
test 4 done
starting big number library test, could take a while...
test BN_add
test BN_sub
test BN_lshift1
test BN_lshift (fixed)
test BN_lshift
test BN_rshift1
test BN_rshift
test BN_sqr
test BN_mul
test BN_div
test BN_div_recp
test BN_mod
test BN_mod_mul
test BN_mont
test BN_mod_exp
test BN_exp
running bc
................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
Failed! bc: stack empty
*** Error code 255

Stop.
*** Error code 1

Stop.
-----------------------------------------------------------------------------

-- 

Dave Dulek
System Administration
Fastenal Company
E-mail: [EMAIL PROTECTED]
Phone: (507) 453-8149
Fax:   (507) 453-8333
______________________________________________________________________
OpenSSL Project                                 http://www.openssl.org
Development Mailing List                       [EMAIL PROTECTED]
Automated List Manager                           [EMAIL PROTECTED]

Reply via email to