The requirements project isn't even required.
Oh, the irony.
David Moreau Simard
Senior Software Engineer | OpenStack RDO
dmsimard = [irc, github, twitter]
On Sat, Mar 31, 2018 at 11:57 PM, Matthew Thode
wrote:
> The requirements project had a good run, but things
On 03/31/2018 11:57 PM, Matthew Thode wrote:
The requirements project had a good run, but things seem to be winding
down. We only break openstack a couple times a cycle now, and that's
just not acceptable. The graph must go up and to the right. So, it's
time for the requirements project to
The requirements project had a good run, but things seem to be winding
down. We only break openstack a couple times a cycle now, and that's
just not acceptable. The graph must go up and to the right. So, it's
time for the requirements project to close up shop. So long and thanks
for all the