On Wed 03 Jun 2015 10:13:34 PM CEST, Max Reitz wrote:
> If the image version should be upgraded, that is the first we should do;
> if it should be downgraded, that is the last we should do. So split the
> version change block into an upgrade part at the start and a downgrade
> part at the end.
>
>
If the image version should be upgraded, that is the first we should do;
if it should be downgraded, that is the last we should do. So split the
version change block into an upgrade part at the start and a downgrade
part at the end.
Signed-off-by: Max Reitz
Reviewed-by: Eric Blake
Reviewed-by: S
If the image version should be upgraded, that is the first we should do;
if it should be downgraded, that is the last we should do. So split the
version change block into an upgrade part at the start and a downgrade
part at the end.
Signed-off-by: Max Reitz
Reviewed-by: Eric Blake
Reviewed-by: S