Hello looks like your stress test " single thread CPU" is running 1/28 100% vcpu so on host it cannot be more than qemu other stuff and added vmachines cpu usage.If you wanna make a stress test that impact the host CPU load with many-vcpu machines you must use a multithreaded stress test. This is just a reading/wanted result problem not a technical one (If I understand well your needs).
liu_xb...@sina.com wrote:hi,allIn a X3850 x6 IBM server(4sockets,14cores/socket, Xeon E7-4820 v4), running on the rhel6.4 virtual machine (qemu-kvm), and occasionally there will be problems, the problem is:with a 28 vcpu virtual machine as an example:Running sysben in the virtual machine to do a single thread CPU stress testing, in the virtual machine will see this process takes up 100%cpu, but in the host physical machine to see the QEMU process takes up 3% of the cpu.Running in the virtual machine inside the two sysben test, in the virtual machine will see the two processes each occupy 100%cpu, but in the host physical machine to see the QEMU process takes up 6% of the cpu. We tested it on centos7.2. Do you have any solution ?thanks. Cordialement Francois Pussault 10 chemin de négo saoumos apt 202 - bat 2 31300 Toulouse +33 6 17 230 820 fpussa...@contactoffice.fr