this is already required in Los Angeles county in a county ordinance. They are
looking for dc disconnect directly after any combiner box and no conduit
entering a building without disconnect- both commercial and residential. You
wont see it in NEC unless you look in the 2002. I dont have the ord
Some water systems are all plastic except for the solar water heating system.
I agree atmospheric energy I would think would effect the absorber plates more
than frames, but I am not atmospheric energy. Then grounding the piping system
should be adequate, and a copper pipe should be better tha
I like the idea for larger systems, someone tell Sq. D to make a 4 blade 600
volt disconnect. I would like to see it disconnect the "fuse grounded"
conductor also. and then it could be a combiner and load rated disconnect.
darryl
--- On Tue, 9/22/09, Chris Anderson wrote:
> From: Chris And
I am pretty sure it is in the draft of the 2011 code. While we are not governed
yet by the 2011 code, I think it is good practice and is something we should
all do sooner than later. Borrego is moving that direction as we speak. No
reason to wait around for the code to tell us what we have to do
I am being told we need rooftop DC disconnects for a 6 string
commercial solar install, instead of DC disconnects in the mech room.
I don't see anything about this in the NEC. Any truth to this?
thanks
Troy Harvey
-
Heliocentric
801-453-9434
tahar...@heliocentric.org
__
Colleagues:
Some could not open the tiny URL. Here is a full URL for the Ilso line:
http://www.ilsco.com/ProductsDetail.aspx?kfjkff=OAEZSVkMfBWEECuHv28GcQ%3d%3d&fjjfhjhj=LhaI%2fYkpvSVw1sKKc07QxKB1LBKiNLvuN5AVp5Sa2fE%3d
You can select one pole, one primary and one secondary from the filter and
Hello Wrenches,
How do you rate the UniRac, ClickSys mounting systems? What are your
likes and dislikes?
Thanks,
Drake Chamberlin
Athens Electric
OH License 44810
CO License 3773
NABCEP TM Certified PV Installer
Office - 740-448-7328
Mobile - 740-856-9648 _