Re: [RE-wrenches] Maryland battery system installer needed

2014-04-08 Thread Jeffrey Yago
I just completed a pole-mounted array/battery/inverter system to power an LED scoreboard for a Little League ball field in Virginia. Same client is also building another ball field in Aberdeen Maryland and will need same type system as no utility power avaiable. They must have operational by

[RE-wrenches] Installer in Jamaica

2014-04-08 Thread Chris @ The Oasis
Dear Folks: Does anyone do PV installations in Jamaica? If so, I have a lead for you. Please contact me offlist. Best, Chris Daum Oasis Montana Inc. 406-777-4309 406-777-0830 fax www.oasismontana.com ___ List sponsored by Home Power magazine

[RE-wrenches] shared neutral critical load panel

2014-04-08 Thread Mac Lewis
Hello wrenches, When installing hybrid systems and consolidating critical load panel circuits, how do you deal with shared neutrals? We have moved both of these loads into the critical load panel or negotiated both loads being left out of the critical load panel because of this shared neutral

Re: [RE-wrenches] shared neutral critical load panel

2014-04-08 Thread william
Mac: Is your system 120 or 120/240? If it is 120 only and if your shared neutrals are part of a multi-wire branch circuit, you have problems. The only solution I know of is to combine the circuits so they are on the same phase and share the same OCPD. Otherwise itÂ’s time to rewire. If