I just completed a pole-mounted array/battery/inverter system to power an
LED scoreboard for a Little League ball field in Virginia. Same client is
also building another ball field in Aberdeen Maryland and will need same
type system as no utility power avaiable. They must have operational by
Dear Folks:
Does anyone do PV installations in Jamaica? If so, I have a lead for you.
Please contact me offlist.
Best,
Chris Daum
Oasis Montana Inc.
406-777-4309
406-777-0830 fax
www.oasismontana.com
___
List sponsored by Home Power magazine
Hello wrenches,
When installing hybrid systems and consolidating critical load panel
circuits, how do you deal with shared neutrals? We have moved both of
these loads into the critical load panel or negotiated both loads being
left out of the critical load panel because of this shared neutral
Mac:
Is your system 120 or 120/240? If it is 120 only and if your shared
neutrals are part of a multi-wire branch circuit, you have problems. The
only solution I know of is to combine the circuits so they are on the same
phase and share the same OCPD. Otherwise itÂ’s time to rewire.
If
4 matches
Mail list logo