Do you have the last firmware for the mate3?...002-019-000
Bill
Feather River Solar Electric
On 4/27/2016 5:31 PM, jay wrote:
HI All,
I’ve got a problem that outback tech hasn’t been able to figure out.
off grid system
mate 3
quad stacked VFX 3648
The generator is set to specific start/sto
I use a delay relay alot for water pumps, lights ect. Brand is Altronics
model 6030 check them out you may find a better solution at altronics, we
build around this alot easy to do.
Jerry
On Apr 27, 2016 11:47 AM, "Starlight Solar Power Systems" <
la...@starlightsolar.com> wrote:
Hello Wrenches,
HI All,
I’ve got a problem that outback tech hasn’t been able to figure out.
off grid system
mate 3
quad stacked VFX 3648
The generator is set to specific start/stop daily timer. This works fine.
The client has plenty of solar for the day, and when he runs his generator he
doesn’t want the ch
One you may want to look at is the Peltec 191 multifunction time
relay.
It's AC/DC 12-240 volts.
http://peltectimers.com/
Roy Butler
NABCEP Certified Solar PV Installer®
NYSERDA eligible PV & wind installer
Four Winds Renewable Energy, LLC
8902 Route 46, Arkport, NY
Call your local electrical supply they will probably have to order but there
are loads of timer relay in various scenarios available.
Dana Orzel
Great Solar Works, Inc - NABCEP # 051112-136
E - d...@solarwork.co
Hello Wrenches,
I need a relay with off delay timer to control a battery charger and I’m having
difficulty finding the type. The sequence I need is as follows:
Power or trigger on, relay closes.
Power or trigger off, relay opens and starts delay timer.
Power or trigger on, relay closes after time
6 matches
Mail list logo