Re: [RE-wrenches] Add-On to DGT, string inverter, w/Different Modules on 2nd string

2016-06-22 Thread Ash Bowersock
to us isolating the new system from his old and combining the 2 at a new PV AC Combiner panel prior to new POI. Thanks for the feed-back Brian. Ash Bowersock Senior System Designer [RGS Energy]<http://www.rgsenergy.com/> 833 W. South Boulder Road | Louisville, CO 80027 tel 303.22

Re: [RE-wrenches] Add-On to DGT, string inverter, w/Different Modules on 2nd string

2016-06-22 Thread Ash Bowersock
Thanks for the good info Brian. I had tried to explain the single MPPT issue to the client, but probably didn’t use the right words and just made him mad because “the system was designed to accomidate an addition”… ug. Ash Bowersock Senior System Designer [RGS Energy]<h

Re: [RE-wrenches] Add-On to DGT, string inverter, w/Different Modules on 2nd string

2016-06-22 Thread Ash Bowersock
Thank you very much for the feed-back Jerry. I had seen something similar before but wasn’t sure it was the by-pass diodes. Makes sense and gives me something to take to the client along with my recommendations. Ash Bowersock Senior System Designer [RGS Energy]<http://www.rgsenergy.com/>

[RE-wrenches] Add-On to DGT, string inverter, w/Different Modules on 2nd string

2016-06-21 Thread Ash Bowersock
is "poor design practice"? The more technical and dry an explanation, the better ;) If you can't convince them, bore them to tears with the details. Ash Bowersock Senior System Designer [RGS Energy]<http://www.rgsenergy.com/> 833 W. South Boulder Road | Louisville,