Wrenches,
Are there any recommendations on repair shops for the above device? Schneider
provided me with a list of repair shops but none of them work on charge
controllers. The charge controller in question throws a ground fault error when
there isn’t one. I verified this with a different charg
Good morning Wreches. What’s the furthest distance anyone has placed Enphase
micros from the Envoy? We’ve done ~300’ without any issues related to comms or
performance.
Thanks,
rick brown
SolShine Energy Alternatives, LLC
Electrical & Solar Contracting Services
www.SolShineEnergy.com
Cave Sprin
Many batteries on circuit boards are for the Real-Time Clock (RTC) in the event
that the main power source is absent. I believe that’s the case for the Envoy.
rick brown
SolShine Energy Alternatives, LLC
Electrical & Solar Contracting Services
www.SolShineEnergy.com
Check, Virginia 24072
O: 540.
Drake,
If you’re not in a hurry, when I upgrade my legacy system you can have mine.
Contact me offline if interested.
rick brown
SolShine Energy Alternatives, LLC
Electrical & Solar Contracting Services
www.SolShineEnergy.com
Check, Virginia 24072
O: 540.235.3095
M: 540.808.9502
VA Class A Con
out and
> causing the problem that might help pinpoint it but in our case the entire
> string was offline because the failed RSD was the last module in the string.
>
> With Kind Regards
> Carl Adams
> SunRock Solar
> 513.290.9072
>
>> On Mon, Jun 21, 2021, 5:45 PM r.
ally says lift each panel to find
> the problem. Not a happy camper!
>
> Jeremy Coxon NABCEP
> Certified MWBE
>
> Sent from my iPhone
>
>>> On Jun 21, 2021, at 12:43 PM, "r...@solshineenergy.com"
>>> wrote:
>>>
>> Carl,
>> Th
gt;> Rick,
>> I would check with SMA to make sure you have the latest firmware.
>>
>> Best regards,
>> Lloyd
>>
>> Lloyd Hoffstatter
>> Sunstruck Consulting
>>
>> Get Outlook for iOS
>> From: RE-wrenches on behalf of
&
Wrenches,
I’m in need of some troubleshooting help on a newly installed system with rapid
shutdown. System consists 2 SMA SB5.0-1 SP-US-41 (RSD version), RSD devices are
APS RSD-S-PLC. Each SB is configured with two strings of 9. Modules are REC
Alpha 360s.
This system was fully functional fo
0V signal. My plan was to
>> rewire that start signal to the Sol-Ark inverter, but keep the transfer
>> switch as the main service point to prevent any kind of backfeeding to the
>> grid.
>> Cheers,
>> Dave
>>
>> On Thu, Jun 17, 2021 at 9:41 AM r...@so
Wrenches,
I’m looking to tie in a Generac Powerpact 7.5kW generator with transfer switch
to a Sol-Ark 12kW. The Sol-Ark has a two wire start (NO or NC) capability,
however, the Generac transfer switch operates on loss of 240V. Is my only
option to use a relay driven by the two wire start to dro
Drake,
Check on eBay. They have a bunch.
rick brown
SolShine Energy Alternatives, LLC
Electrical & Solar Contracting Services
www.SolShineEnergy.com
Check, Virginia 24072
O: 540.235.3095
M: 540.808.9502
VA Class A Contractor Lic# 2705147660
VA Master Electrician Lic# 2710062762
VA Alternative E
There’s this company. I don’t have any experience with their products but the
concept is promising.
http://cyboenergy.com/
rick brown
SolShine Energy Alternatives, LLC
Electrical & Solar Contracting Services
www.SolShineEnergy.com
Check, Virginia 24072
O: 540.235.3095
M: 540.808.9502
VA Class
ergy Systems Installer
NABCEP Certified PV Installation Professional 110112-21
> On Mar 2, 2021, at 1:31 PM, r...@solshineenergy.com wrote:
>
> Jason,
>
> You’re thinking of the IQ7+. The IQ7A is rated for 349W.
>
>
>
>
> rick brown
> SolShine Energy A
Jason,
We recently completed a ground-mount array ~350’ from the Envoy and all micros
are able to report.
> On Mar 1, 2021, at 8:47 AM, Jason Szumlanski
> wrote:
>
> How far has anyone ever put an IQ Envoy from an array and successfully
> monitored it?
>