Dana and August,
I have used a patent pending prototype of a solar module lifting system that I
like very much, complies with OSHA and solves all the lifting issues.
I know the founder and he is looking for some feedback from installers to gain
some industry traction while talking to potential
It's been all downhill for us hippies since Jerry Rubin went to work on Wall
Street.
Sent from my Verizon Wireless BlackBerry
-Original Message-
From: Solarguy nt...@1scom.net
Sender: re-wrenches-boun...@lists.re-wrenches.orgDate: Sat, 17 Aug 2013
10:41:38
To:
If we have another long outage here in CT and we seem to have one every year
now, I don't want to have to explain to my customers why I didn't use this
inverter.
Sent from my Verizon Wireless BlackBerry
-Original Message-
From: Gary Willett g...@icarussolarservices.com
Sender:
Had a couple of inquiries for these Dow Solar Shingles. It's difficult to
find any specs, pricing, how they are wired, and other information about
them.
I searched the archives and didn't find anything so anyone have any
experience with them.
Thank you.
Larry Liesner
Design and Installations
How do you tighten a Heyco Sunbundler?
Granted it will prevent the cable from falling to the roof but I could not
tighten them to the point of securing the cable from movement.
Sent from my Verizon Wireless BlackBerry
-Original Message-
From: Brian Mehalic br...@solarenergy.org
Sender:
Gary,
I thought most inverters share power. So if the inverter has a 60A transfer
switch and all of that is needed for loads then none for charging and as
load demand decreases, charging increases.
Larry Liesner
Elektron Solar
On Feb 28, 2013 11:33 AM, g...@icarussolarservices.com wrote:
Hello Wrenches,
Installing rail mounted PV array on a 2 1/2 / 12 pitch EPDM residential
roof. It's a flat section of roof in the middle of the house. Need to keep
it low so would like to use 3 or 4 Unirac standoffs. The standard 1-6
peel and stick witches hat is fine for a 7 standoff but too tall
I am a dealer for Ampair wind turbines. The 100 watt is low output, about 50 to
75 ah/day but extremely quiet and durable (survives hurricanes). I have been
competing in the marine market with the now AirBreeze for 15 years. Or take a
look at the 600 for more output. All Ampair's are marine
Todd,
So true, thanks for the reality check. An energy survey is required here in CT
if you want rebate money.
Larry Liesner
Sent from my Verizon Wireless BlackBerry
-Original Message-
From: toddc...@finestplanet.com
Sender: re-wrenches-boun...@lists.re-wrenches.orgDate: Thu, 15 Mar
Jeff,
SunWize has one that measures 14.5 x 10.3 x 7.5 for GRP 22. They also have a
pole mount kit for it.
The part # for the box is 6061BE141007-A. It's all on page 90 of their
catalogue.
SunWize 800-817-6527
Larry Liesner
Wirewiz
31 Lincoln St
Westport, CT 06880
Phone: 203-644-2404
wire
David,
Here is a link to what you might be looking for:
http://www.outbackpower.com/pdf/tech_notes/120_vac_single_inverter.pdf
Larry Liesner
Wirewiz
31 Lincoln St
Westport, CT 06880
203-644-2404
wire...@gmail.com
www.wire-wiz.com
NABCEP Certified PV Installer (# 032611-184)
On Tue, Dec 6, 2011
to anyone with less than 50
installs is a bit extreme and quite frankly a little arrogant.
Larry Liesner
Wirewiz
31 Lincoln St
Westport, CT 06880
Phone: 203-644-2404
wire...@gmail.com
www.wire-wiz.com
On Oct 9, 2011, at 12:31 PM, North Texas Renewable Energy Inc wrote
Again, with all due respect, the don't talk to anyone with less than 50
installs is a bit extreme and quite frankly a little arrogant.
Larry Liesner
Wirewiz
31 Lincoln St
Westport, CT 06880
Phone: 203-644-2404
wire...@gmail.com
www.wire-wiz.com
On Oct 9, 2011, at 12:31 PM, North Texas
Andrew,
Koyaanisqatsi is also a great movie by Francis Ford Copolla. You should all
see it. It's been awhile since I've seen it but if I remember correctly it's
a Hopi Indian term meaning once we start digging from the earth, we're
screwed beyond repair.
Larry Liesner
Design and Installations
Wrenches,
I am installing Lumeta peel and stick modules (similar to laminates) on a
flat EPDM roof. No racking. NEC2008 690.31(B) says single conductor cable
listed and labeled as PV wire shall be permitted in exposed outdoor
locations...within the array. 690.2 defines array as a mechanically
Lumeta dealer has been sending links for unlisted wire management systems,
nothing from Lumeta itself. Cooper B-Line EnviroShield is listed and is an
easier drop in raceway but very expensive.
On Tue, Sep 6, 2011 at 4:02 PM, Mark Frye ma...@berkeleysolar.com wrote:
**
The idea of within the
of plain boxes with no labeling being installed as
controllers.
Thank you.
Larry Liesner
Wirewiz
31 Lincoln St
Westport, CT 06880
Phone: 203-644-2404
wire...@gmail.com
www.wire-wiz.com
On Sep 2, 2011, at 11:51 AM, Larry Brown wrote:
Wrenches,
After Hurricane Irene left a lot of people
Hello Wrenches,
My employer has the inside track on a 1MW install on .5/12 standing seam
metal roofs (two separate roofs). This is by far larger than anything we've
designed so I am looking for a ballpark cost/watt. I'm at around $4/watt. I
realize there are lots of variables and I am looking
I have been prolonging the temp comp. absorption voltage (no current) on start
batteries in boats for many years without any problems.
Larry Liesner
Wirewiz
31 Lincoln St
Westport, CT 06880
Phone: 203-644-2404
wire...@gmail.com
www.wire-wiz.com
On Apr 28, 2011, at 5:52 PM, Starlight Solar
Ask SolarFest in Vermont how they did it.
Sent from my Verizon Wireless BlackBerry
-Original Message-
From: boB Gudgel b...@midnitesolar.com
Sender: re-wrenches-boun...@lists.re-wrenches.orgDate: Wed, 27 Apr 2011
16:56:53
To: RE-wrenchesre-wrenches@lists.re-wrenches.org
Reply-To:
For what it's worth, I use a Balmar Regulator on boats for engine alternator
charging. The Balmar times how long it takes to go from SOC to your setpoint
absorption voltage. That time determines absorption time. It does this each
and every charge. Not as accurate as measuring current but it does a
Ezra,
Do you follow guidelines as to the rights and responsibilities of test
takers. Do test takers have a right to see the questions they got wrong?
Larry Liesner
Wirewiz
Westport, CT
Phone: 203-644-2404
Fax: 203-557-0556
wire...@gmail.com
www.wire-wiz.com
On Apr 1, 2011, at 1:14 AM, Andrew
is unfair. We are
all in the same industry and we are all trying to make a living here but that
ad hits below the belt to highly qualified non certificants.
Thank you.
Larry Liesner
Wirewiz
Westport, CT
Phone: 203-644-2404
Fax: 203-557-0556
wire...@gmail.com
www.wire-wiz.com
On Apr 1, 2011
as the six weeks to wait for pass/fail notification, they keep you
hangin!
They notify you by snail mail, not email. Hint: if the plain brown envelope
says do not bend on it, pop the champagne, you passed.
Larry Liesner
Wirewiz
Westport, CT
Phone: 203-644-2404
Fax: 203-557-0556
wire
Kent, Jason, or anyone else
Would you a have a simple one-line you could share for wiring the inverter on
the utility side of the transfer switch?
Thank you.
Larry Liesner
Wirewiz
Westport, CT
Phone: 203-644-2404
Fax: 203-557-0556
wire...@gmail.com
www.wire-wiz.com
On Mar 26, 2011, at 6:04
could keep it as is and be able to add a grid tie battery backup to it (using
same backup loads). This schematic would work in that situation as well but
wouldn't have the To Non-Backed UP Loads tap.
Larry Liesner
Wirewiz
Westport, CT
Phone: 203-644-2404
Fax: 203-557-0556
wire...@gmail.com
This doesn't solve the reliability concern of a contactor but on a webinar I
heard a rep from Schneider say the XW (with GEN and GRID AC IN's) will not
backfeed a generator and will do it without a contactor. Is that true?
Larry Liesner
Wirewiz
Westport, CT
Phone: 203-644-2404
Fax: 203-557-0556
Dean,
No experience with Mage but the two prep courses I took were a waist of time
and money (IMHO). Find yourself a one day John Wiles seminar for $100, that
is well worth it. Study, study, study. I would set aside 3-4 hours a day
until test time. Become quick and sure at referencing the NEC,
source circuit and PV output
circuit. Once for over irradiance and once for continuous use.
But a handout at a recent seminar that I went to totally confused me.
Can anyone spell it out very clearly?
Thank you.
Larry Liesner
Wirewiz
Westport, CT
Phone: 203-644-2404
Fax: 203-557-0556
wire
.
Can anyone spell it out very clearly?
Thank you.
Larry Liesner
Wirewiz
Westport, CT
Phone: 203-644-2404
Fax: 203-557-0556
wire...@gmail.com
www.wire-wiz.com
___
List sponsored by Home Power magazine
List Address: RE-wrenches@lists.re
and PV output
circuit. Once for over irradiance and once for continuous use.
But a handout at a recent seminar that I went to totally confused me.
Can anyone spell it out very clearly?
Thank you.
Larry Liesner
Wirewiz
Westport, CT
Phone: 203-644-2404
Fax: 203-557-0556
wire...@gmail.com
it is
actually required then please use your influence to get NABCEP to stop running
of this ad.
Thank you.
Larry Liesner
Wirewiz
Westport, CT
Phone: 203-644-2404
Fax: 203-557-0556
wire...@gmail.com
www.wire-wiz.com
On Feb 6, 2011, at 11:36 PM, Bob-O Schultze wrote:
Larry, Aram, etc,
Let me put
and the ad ticked me off.
Larry Liesner
Wirewiz
Westport, CT
Phone: 203-644-2404
Fax: 203-557-0556
wire...@gmail.com
www.wire-wiz.com
On Feb 7, 2011, at 11:16 AM, Bill Hoffer wrote:
Larry
My PE is not required for the majority of work I do either, but I get a
considerable edge over my