Re: [RE-wrenches] sharp triangle modules

2009-02-07 Thread Peter Parrish
g.com -Original Message- From: re-wrenches-boun...@lists.re-wrenches.org [mailto:re-wrenches-boun...@lists.re-wrenches.org] On Behalf Of jay peltz Sent: Saturday, February 07, 2009 7:11 AM To: RE-wrenches Subject: [RE-wrenches] sharp triangle modules HI All, I've got a project that wi

Re: [RE-wrenches] sharp triangle modules

2009-02-07 Thread Darryl Thayer
HI Jay Yes, I have done one using the unirack system, top down mounts, the layout rack-mounting time was excessive, but the final product was acceptable. Darryl --- On Sat, 2/7/09, jay peltz wrote: > From: jay peltz > Subject: [RE-wrenches] sharp triangle modules > To: "RE-wre

[RE-wrenches] sharp triangle modules

2009-02-07 Thread jay peltz
HI All, I've got a project that will use the sharp triangle modules with the corresponding 142 watt square ones. Has anyone done the racking with Unirac or DPW vs the specific sharp racking. Pros and Cons? I don't need true flush mount, and it won't be inspected. thanks jay peltz power