I've moved the 60 Hz stuff from
http://www.megapathdsl.net/~hmurray/time-nuts/
to
http://www.megapathdsl.net/~hmurray/time-nuts/60Hz/
--
The main graph is now up to sightly over 4 days.
http://www.megapathdsl.net/~hmurray/time-nuts/60Hz/60Hz.png
Peak-to-peak is almost 8 seconds.
Hal,
That's good stuff. Sadly, I've got to convert UTC to your local time to
interpret the results, so I haven't done it. Tom's MJD will be even worse.
The reason is that the loads that cause frequency droop occur during
workdays. Lost cycles are made up at night, so I need to know when local
Hal,
That's good stuff. Sadly, I've got to convert UTC to your local time to
interpret the results, so I haven't done it. Tom's MJD will be even worse.
Bill,
If you know C, see mjd_code.c under www.leapsecond.com/tools/.
Otherwise, if you use Excel it's even easier -- just subtract the
magic