Jonathan Riddell wrote:
>=== What was done engineering wise? ===
>
> * KDE SC 4.9.1 update
> * print-manager review
> * ubiquity LVM and LUKS paritioning for KDE frontend
> * post beta review meeting
> * attica update
> * taglib update
>
>=== What's about to land that might impact the other tea
On Fri, 2012-09-14 at 14:22 +0100, Jim Gumbley wrote:
> Hi,
>
Hi!
Thanks for using Ubuntu. :) FYI, this mailing list is not a support
channel and you would likely get more help via other means. That said,
I'll answer.
> We have a bunch of machines which were installed from the 12.04 point 0
> (r
Dear Jim Gumbley,
On 14 September 2012 14:22, Jim Gumbley
wrote:
> Hi,
>
> We have a bunch of machines which were installed from the 12.04 point 0
> (released May 2012).
>
> We want to update them to the 12.04 point 1 (released 23rd Aug 2012).
>
> However when we run sudo do-release-upgrade we ge
=== What was done engineering wise? ===
* KDE SC 4.9.1 update
* print-manager review
* ubiquity LVM and LUKS paritioning for KDE frontend
* post beta review meeting
* attica update
* taglib update
=== What's about to land that might impact the other teams and release as a
whole? ===
=== S
Hi,
We have a bunch of machines which were installed from the 12.04 point 0
(released May 2012).
We want to update them to the 12.04 point 1 (released 23rd Aug 2012).
However when we run sudo do-release-upgrade we get a message that no new
releases are available.
Is this the designed behaviour?
== What was done engineering wise? ==
* some work on foundations-q-event-based-initramfs
* upstart:
- wading through kernel code and writing tests both confirm that
if a "debugger" re-execs, it retains its debugger status over
ptraced children. This behaviour appears not to be documented.
Week 37/2012
== What was done engineering wise? ==
* quantal
- compiz 0.9.8.2 tagged but not uploaded, pending further testing
- Lots of fixes for the next Unity release
- Switch to explicit Q branches for Unity and Nux (lp:nux/3.0,
lp:unity/6.0)
* precise
- Unity SRU-2 released (in p
== What was done engineering wise? ==
* Final planning in progress for Linaro 12.09 cycle:
http://launchpad.net/linaro-ubuntu/+milestone/12.09
http://launchpad.net/~linaro-foundations/+upcomingwork
* Linaro GCC 4.7 and Linaro GCC 4.6 2012.09 released.
* Linaro QEMU 1.2.0 2012.09 released.