Hi,
Am 27.09.2011 um 12:53 schrieb Ben De Luca:
I have this scenario.
I have:
a low priority job A that requires a consumable resource called
license.
a high priority job B that requires the same consumable resource
called license.
A has checkpoint configuration, where it will checkpoi
I have this scenario.
I have:
a low priority job A that requires a consumable resource called license.
a high priority job B that requires the same consumable resource
called license.
A has checkpoint configuration, where it will checkpoint on job suspend.
I on each computer I have two que