Re: [Veritas-bu] whats wrong with my calendar based backupschedule.bppllist included.

2006-06-13 Thread Bob Stump
goofy isn't the word I was thinking ofbad prcatice to do backups from 6PM to 6AM anyhow. I should have included that I am using NB5.1_MP4 "Marks, Jonathan - Fort Collins, CO" [EMAIL PROTECTED] 6/13/2006 12:02 PM If you are using Netbackup 6.0 you can not have your start window

Re: [Veritas-bu] whats wrong with my calendar based backupschedule.bppllist included.

2006-06-13 Thread Steve Beuttel
I'm sorry ... did I read correctly that you have verified that NBU 6.0 will not allow a start window to cross midnight? And someone actually told you that was a feature because to do so is a bad practice? Is this common experience? Thanks, -Steve- Bob Stump wrote: goofy isn't the word

Re: [Veritas-bu] whats wrong with my calendar based backupschedule.bppllist included.

2006-06-13 Thread Steve Beuttel
I think I may not have read correctly - this referred to Calendar-based schedules, correct? -Steve- Steve Beuttel wrote: I'm sorry ... did I read correctly that you have verified that NBU 6.0 will not allow a start window to cross midnight? And someone actually told you that was a

Re: [Veritas-bu] whats wrong with my calendar based backupschedule.bppllist included.

2006-06-13 Thread Mansell, Richard
, 14 June 2006 4:36 amTo: Marks, Jonathan - Fort Collins, COCc: veritas-bu@mailman.eng.auburn.edu; Bob StumpSubject: Re: [Veritas-bu] whats wrong with my calendar based backupschedule.bppllist included. . As far as having Calendar based schedules crossing midnight you should

Re: [Veritas-bu] whats wrong with my calendar based backupschedule.bppllist included.

2006-06-13 Thread Marks, Jonathan - Fort Collins, CO
wrong with my calendar based backupschedule.bppllist included. goofy isn't the word I was thinking ofbad prcatice to do backups from 6PM to 6AM anyhow. I should have included that I am using NB5.1_MP4 "Marks, Jonathan - Fort Collins, CO" [EMAIL PROTECTED] 6/13/2006 12:02 P

Re: [Veritas-bu] whats wrong with my calendar based backupschedule.bppllist included.

2006-06-13 Thread Marks, Jonathan - Fort Collins, CO
, Jonathan - Fort Collins, CO Cc: Bob Stump; veritas-bu@mailman.eng.auburn.edu Subject: Re: [Veritas-bu] whats wrong with my calendar based backupschedule.bppllist included. I'm sorry ... did I read correctly that you have verified that NBU 6.0 will not allow a start window to cross midnight