[WISPA] concrete cure period

2008-12-30 Thread chris cooper
Does anybody know how long I should plan for concrete cure prior to tower construction? Base is 3x3x8', tower is 150' rohn 65 Thanks, Chris WISPA Wants You! Join today! http://signup.wispa.org/

Re: [WISPA] concrete cure period

2008-12-30 Thread lakeland
-Original Message- From: chris cooper ccoo...@intelliwave.com Date: Tue, 30 Dec 2008 14:28:22 To: 'WISPA General List'wireless@wispa.org Subject: [WISPA] concrete cure period Does anybody know how long I should plan for concrete cure prior to tower construction? Base is 3x3x8', tower is 150

Re: [WISPA] concrete cure period

2008-12-30 Thread Josh Luthman
We waited 3 days for one yard. Put in a 60 ft tv tower (used brackets at the first second floors) on a cold day. On 12/30/08, chris cooper ccoo...@intelliwave.com wrote: Does anybody know how long I should plan for concrete cure prior to tower construction? Base is 3x3x8', tower is 150' rohn

Re: [WISPA] concrete cure period

2008-12-30 Thread Adam Goodman
I think it should be 28 days, regardless of the size. On Tue, Dec 30, 2008 at 2:28 PM, chris cooper ccoo...@intelliwave.com wrote: Does anybody know how long I should plan for concrete cure prior to tower construction? Base is 3x3x8', tower is 150' rohn 65 Thanks, Chris

Re: [WISPA] concrete cure period

2008-12-30 Thread Blair Davis
My girlfriend does concrete for a living. If you are in freezing temps, 28 days. If you are above freezing, 14 days. For a standard 4000psi mix. chris cooper wrote: Does anybody know how long I should plan for concrete cure prior to tower construction? Base is 3x3x8', tower is 150' rohn 65

Re: [WISPA] concrete cure period

2008-12-30 Thread Scott Reed
...@intelliwave.com Date: Tue, 30 Dec 2008 14:28:22 To: 'WISPA General List'wireless@wispa.org Subject: [WISPA] concrete cure period Does anybody know how long I should plan for concrete cure prior to tower construction? Base is 3x3x8', tower is 150' rohn 65 Thanks, Chris

Re: [WISPA] concrete cure period

2008-12-30 Thread Cameron Kilton
[mailto:wireless-boun...@wispa.org] On Behalf Of Scott Reed Sent: Tuesday, December 30, 2008 7:34 PM To: lakel...@gbcx.net; WISPA General List Subject: Re: [WISPA] concrete cure period Under normal conditions is a key phrase. Colder takes longer. Drier takes longer, if it ever sets up. Also