Hi All,
Please note that ATSv2 has been merged to branch-2.
Refer to https://github.com/apache/hadoop/commit/
54a694172d7162b2ff45d6e1780c0523cfda66e7
We will continue monitoring if everything works well post-merge.
Regards,
Varun Saxena.
On Mon, Oct 16, 2017 at 9:54 PM, Vrushali C wrote:
> T
Timeline Service v2 should be landing on branch2 shortly.
thanks
Vrushali
On Thu, Sep 7, 2017 at 4:57 PM, Vrushali C wrote:
> Thanks everyone.
>
> It has been over a week (~9 days) since TSv2 has been merged to trunk with
> no problems thus far. We are now thinking about merging timeline servic
Thanks everyone.
It has been over a week (~9 days) since TSv2 has been merged to trunk with
no problems thus far. We are now thinking about merging timeline service v2
to branch2 some time in the next few weeks.
So far, we have been maintaining a branch2 based YARN-5355_branch2 along
with our tru
Good to see this merged. I have initiated a separate thread with a smaller
set of stakeholders to discuss inclusion in 2.9. We'll report back to the
2.9 release thread as soon as we reach consensus.
On Thu, Aug 31, 2017 at 10:39 AM, Ravi Prakash wrote:
> +1 to maintaining history.
>
> On Wed, Au
+1 to maintaining history.
On Wed, Aug 30, 2017 at 11:38 PM, varunsax...@apache.org <
varun.saxena.apa...@gmail.com> wrote:
> Yes, I had used "git merge --no-ff" while merging ATSv2 to trunk.
> Maintaining history I believe can be useful as it can make reverts
> easier if at all required.
> And
Yes, I had used "git merge --no-ff" while merging ATSv2 to trunk.
Maintaining history I believe can be useful as it can make reverts
easier if at all required.
And can be an easy reference point to look at who had contributed what
without having to go back to the branch.
Regards,
Varun Saxena.
O
Thanks Sangjin for the link to the previous discussions on this! I think
that helps answer Steve's questions.
As decided on that thread [1], YARN-5355 as a feature branch was merged to
trunk via "git merge --no-ff" .
Although trunk already had TSv2 code (alpha1) prior to this merge, we chose
to d
The "git" way of doing things would be to rebase the feature branch on
master (trunk) and then commit the patch stack.
Squashing the entire feature into a 10 MB megapatch is the "svn" way of
doing things.
The svn workflow evolved because merging feature branches back to trunk
was really painful i
I recall this discussion about a couple of years ago:
https://lists.apache.org/thread.html/43cd65c6b6c3c0e8ac2b3c76afd9eff1f78b177fabe9c4a96d9b3d0b@1440189889@%3Ccommon-dev.hadoop.apache.org%3E
On Wed, Aug 30, 2017 at 2:32 PM, Steve Loughran
wrote:
> I'd have assumed it would have gone in as one
I'd have assumed it would have gone in as one single patch, rather than a full
history. I don't see why the trunk needs all the evolutionary history of a
build.
What should our policy/process be here?
I do currently plan to merge the s3guard in as one single squashed patch; just
getting HADOOP
I'm adding my +1 (binding) to conclude the vote.
With 13 +1's (11 binding) and no -1's, the vote passes. We'll get on with
the merge to trunk shortly. Thanks everyone!
Regards
Vrushali
On Tue, Aug 29, 2017 at 10:54 AM, varunsax...@apache.org <
varun.saxena.apa...@gmail.com> wrote:
> +1 (bindin
+1 (binding).
Kudos to all the team members for their great work!
Being part of the ATSv2 team, I have been involved with either development
or review of most of the JIRAs'.
Tested ATSv2 in both secure and non-secure mode. Also verified that there
is no impact when ATSv2 is turned off.
Regards,
+1
I helped deploy and run the ATSv2 aux service on a cluster with ~400 node
managers on it. I also verified that ATSv2 has no significant impact when
disabled.
Nice work everyone!
On Tue, Aug 29, 2017 at 6:17 AM, Aaron Gresch wrote:
> +1 non-binding
>
> I did some testing with security off ru
+1 non-binding
I did some testing with security off running both ATS v1 and v2.
On Tue, Aug 22, 2017 at 1:32 AM, Vrushali Channapattan <
vrushalic2...@gmail.com> wrote:
> Hi folks,
>
> Per earlier discussion [1], I'd like to start a formal vote to merge
> feature branch YARN-5355 [2] (Timeline S
+1 (binding)
I participated in the review for the reader authorization and verified that
ATSv2 has no significant impact when disabled. Looking forward to seeing
the next increment in functionality in a release. A big thank you to
everyone involved in this effort!
Jason
On Tue, Aug 22, 2017 a
+1 (binding)
I’ve participated in the review of ATSv2 security related patch.
JIan
> On Aug 28, 2017, at 1:39 AM, Rohith Sharma K S
> wrote:
>
> +1 (binding)
>
> Thank you very much for the great team work!
>
> Built from source and deployed in secured cluster. The below are the test
> resu
+1 (binding)
Thank you very much for the great team work!
Built from source and deployed in secured cluster. The below are the test
result.
Deployment :
Standard hadoop security deployment authentication and authorization as
well.
Branch-2 Hadoop and Hbase security cluster.
Branch-3
That makes sense to me, after merge to trunk and branch 2, it probably
makes sense to create a new jira and feature branch for atsv2 additional
feature dev.
Cheers,
Joep
On Fri, Aug 25, 2017 at 3:05 PM, Vrushali C wrote:
> Hi Subru,
>
> Thanks for your vote and your response!
>
> Regarding you
Hi Subru,
Thanks for your vote and your response!
Regarding your question about merging to branch2, I think, after the merge
to trunk is done, it will be good to merge to branch-2 as soon as we can.
A lot of testing with trunk has been done presently and it will be good to
repeat the same with th
Thanks Subru for voting.
> What are the timelines you are looking for getting this into branch-2?
We haven't yet decided on it and were thinking of discussing this in detail
within the team after merge to trunk.
The timelines would depend on whether we release whatever we merge to trunk
in 2.9 o
+1 (binding).
I have been following the effort and had few design discussions around the
team especially about how it integrates with Federation. Overall I feel
it's a welcome improvement to YARN.
What are the timelines you are looking for getting this into branch-2?
Thanks,
Subru
On Fri, Aug 2
+1 (binding)
I've built the current branch, and checked out a few basic areas including
documentation. Also perused the most recent changes that went in.
Thanks much for the great team work! I look forward to seeing it in action.
Regards,
Sangjin
On Fri, Aug 25, 2017 at 9:27 AM, Haibo Chen wro
+1 from my side.
More from the perspective of ensuring there is no impact of ATSv2 when it
is off (by default), I deployed the latest YARN-5355 bits into a few
clusters and ran internal Smoke tests. The tests shows no impact when ATSv2
is off.
Best,
Haibo
On Thu, Aug 24, 2017 at 7:51 AM, Sunil G
Thank you very much Vrushali, Rohith, Varun and other folks who made this
happen. Great work, really appreciate the same!!
+1 (binding) from my side:
# Tested ATSv2 cluster in a secure cluster. Ran some basic jobs
# Accessed new YARN UI which shows various flows/flow activity etc. Seems
fine.
# B
Hi Naga
Thank you for the kind words and appreciate your vote very much. Yes, among
everyone who has worked on contributing to the TSv2 code, there has been a
strong sense of camaraderie.
Let me try to address your questions one by one.
bq. Though i have not tested, just went through the jiras a
+1 (Binding), Great work guys, unwavering dedication and team effort. Kudos
to the whole team.
Though i have not tested, just went through the jiras and features added.
Just wanted to know whether there was any other key out standing features
left after phase 2 and their impacts ?
And it would int
Hi All,
Just to update.
Folks who may be interested in going through the documentation for the
feature can refer to current documentation attached in pdf format, on the
umbrella JIRA i.e. YARN-5355.
Furthermore, we have run the YARN-5355 patch(with all the changes made in
the branch) against trun
+1 (non-binding) for the merge
@Vinod I hope that means a +1 from you as well!
Cheers,
Joep
On Tue, Aug 22, 2017 at 11:15 AM, Vinod Kumar Vavilapalli <
vino...@apache.org> wrote:
> Such a great community effort - hats off, team!
>
> Thanks
> +Vinod
>
> > On Aug 21, 2017, at 11:32 PM, Vrushali
Such a great community effort - hats off, team!
Thanks
+Vinod
> On Aug 21, 2017, at 11:32 PM, Vrushali Channapattan
> wrote:
>
> Hi folks,
>
> Per earlier discussion [1], I'd like to start a formal vote to merge
> feature branch YARN-5355 [2] (Timeline Service v.2) to trunk. The vote will
> r
Hi folks,
Per earlier discussion [1], I'd like to start a formal vote to merge
feature branch YARN-5355 [2] (Timeline Service v.2) to trunk. The vote will
run for 7 days, and will end August 29 11:00 PM PDT.
We have previously completed one merge onto trunk [3] and Timeline Service
v2 has been pa