Wilfred Spiegelenburg created YARN-6490: -------------------------------------------
Summary: Turn on assign multiple after removing continuous scheduling Key: YARN-6490 URL: https://issues.apache.org/jira/browse/YARN-6490 Project: Hadoop YARN Issue Type: Sub-task Reporter: Wilfred Spiegelenburg Assignee: Wilfred Spiegelenburg To help loading up a cluster when not using continuous scheduling change the default for {{yarn.scheduler.fair.assignmultiple}} from {{false}} to {{true}}. This requires the change from YARN-5035 to make sure that we leverage assigning more than one container to a node per heartbeat. -- This message was sent by Atlassian JIRA (v6.3.15#6346) --------------------------------------------------------------------- To unsubscribe, e-mail: yarn-issues-unsubscr...@hadoop.apache.org For additional commands, e-mail: yarn-issues-h...@hadoop.apache.org