Current Dev Position: YP 4.1 M4 (In QA)

Next Deadline: 28th October 2022 YP 4.1 Release 

 

Next Team Meetings:

*       Bug Triage meeting Thursday October 6th 7:30 am PDT (
<https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09>
https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*       Weekly Project Engineering Sync Tuesday October 4th at 8 am PDT (
<https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09>
https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09
<https://zoom.us/j/990892712> )
*       Twitch -  See  <https://www.twitch.tv/theyoctojester>
https://www.twitch.tv/theyoctojester

 

Key Status/Updates:

*       YP 4.1 rc2 is now in QA
*       Richard will not be around for the next two weeks. With 4.1 rc2 in
QA for the next week, things should be quiet and the TSC can then decide on
whether to release or if an rc3 is needed for any reason. Alexandre/Luca
will test/queue patches during this time, patches are not expected to merge.
Ross is around and should be able to cover most other things if/as needed.
*       At release we released the core layer was still advertising
kirkstone so this was removed. This did mean some simple changes were needed
to layers to mark compatibility with the new release, we'll aim to do this
earlier in the next release.
*       YP 4.2 Proposed Timeline document is at:
<https://docs.google.com/document/d/1X5KM_3BiEsIrHBO93ULvYHQJ72NqS5U5jjwWo5b
xTiY/edit?usp=sharing>
https://docs.google.com/document/d/1X5KM_3BiEsIrHBO93ULvYHQJ72NqS5U5jjwWo5bx
TiY/edit?usp=sharing
*       Help is very much welcome in trying to resolve our autobuilder
intermittent issues. You can see the list of failures we're continuing to
see by searching for the "AB-INT" tag in bugzilla:
<https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT>
https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT

 

Ways to contribute:

*       There are bugs identified as possible for newcomers to the project:
<https://wiki.yoctoproject.org/wiki/Newcomers>
https://wiki.yoctoproject.org/wiki/Newcomers
*       There are bugs that are currently unassigned for YP 4.1. See:
<https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium.2B_4.1_Unassigned_Enha
ncements.2FBugs>
https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium.2B_4.1_Unassigned_Enhan
cements.2FBugs
*       We'd welcome new maintainers for recipes in OE-Core. Please see the
list at:
<http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/mai
ntainers.inc>
http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/main
tainers.inc and discuss with the existing maintainer, or ask on the OE-Core
mailing list. We will likely move a chunk of these to "Unassigned" soon to
help facilitate this.
*       Help us resolve CVE issues:
<https://docs.google.com/spreadsheets/d/e/2PACX-1vRgNISmH0Ditf0bRtSezeR2XsgK
IiSFJKF6KJUHpnzocNGzvKZbuSDKfmV3n64BFXDRqElBSJnhHtG4/pubchart?oid=1993375488
&format=interactive> CVE metrics 

 

YP 4.1 Milestone Dates:

*       YP 4.1 M4 is built and in QA
*       YP 4.1 M4 Release date 2022/10/28

 

Upcoming dot releases:

*       YP 3.1.20 build date 2022/10/10
*       YP 3.1.20 Release date 2022/10/21
*       YP 4.0.5 build date 2022/10/31
*       YP 4.0.5 Release date 2022/11/11

 

Tracking Metrics:

*       WDD 2404 (last week 2394) (
<https://wiki.yoctoproject.org/charts/combo.html>
https://wiki.yoctoproject.org/charts/combo.html)
*       OE-Core/Poky Patch Metrics

*       Total patches found: 1217 (last week 1215)
*       Patches in the Pending State: 311 (26%) [last week 311 (26%)]

*        <https://autobuilder.yocto.io/pub/non-release/patchmetrics/>
https://autobuilder.yocto.io/pub/non-release/patchmetrics/

 

The Yocto Project's technical governance is through its Technical Steering
Committee, more information is available at:

 <https://wiki.yoctoproject.org/wiki/TSC>
https://wiki.yoctoproject.org/wiki/TSC

 

The Status reports are now stored on the wiki at:
<https://wiki.yoctoproject.org/wiki/Weekly_Status>
https://wiki.yoctoproject.org/wiki/Weekly_Status

 

[If anyone has suggestions for other information you'd like to see on this
weekly status update, let us know!]

 

Thanks,

 

Stephen K. Jolley

Yocto Project Program Manager

*    Cell:                (208) 244-4460

* Email:              sjolley.yp...@gmail.com
<mailto:sjolley.yp...@gmail.com> 

 

-=-=-=-=-=-=-=-=-=-=-=-
Links: You receive all messages sent to this group.
View/Reply Online (#58264): https://lists.yoctoproject.org/g/yocto/message/58264
Mute This Topic: https://lists.yoctoproject.org/mt/94115282/21656
Group Owner: yocto+ow...@lists.yoctoproject.org
Unsubscribe: https://lists.yoctoproject.org/g/yocto/unsub 
[arch...@mail-archive.com]
-=-=-=-=-=-=-=-=-=-=-=-

Reply via email to