Hello everybody, I set up a database using the "makerea" tool (Windows XP). Name: EAS Startdate: 200701 Enddat: 201212 Creating BOTH REA and WAV folders After this is done all folders are created, and I can choose the dates from the drop-down lists. Then I copy&paste some S-file (say 12-1518-52L.S200808) into the REA/EAS__/2008/08 folder and the corresponding wave file (2008-08-12-1517-26S.GD____040) into WAV/EAS__/2008/08. Now I click the "update ..." button in SeisAn, enter the name of the database, some operator id, press return on the lock id, enter the start and end date (same as above). It generates some output ... STOP WITH STATUS= 3 Print output in file print.out Summary file in hypsum.out Nordic in hyp.out Stop - Program terminated. Now I "refresh" the event list by changing the date and changing it back, select the one event (12/08/2008 15:18 52 LQ ...) and click on "Plot". Then the console window closes, and opens a new, empty one and that's all that happens. Am I doing anything wrong? Kind regards Maximilian Krickl ________________________________
Maximilian Krickl Dipl.-Ing. (FH), Regierungsbeschäftigter Fachbereich Landeserdbebendienst, Beratung Untergrundgefahren Geologischer Dienst NRW - Landesbetrieb - De-Greiff-Str. 195 D- 47803 Krefeld Tel.: +49 (0) 21 51 / 897 - 502 Fax: +49 (0) 21 51 / 987 - 505 eMail: [email protected] Internet: http://www.gd.nrw.de <http://www.gd.nrw.de/>
_______________________________________________ seisan mailing list [email protected] http://mailman.uib.no/listinfo/seisan
