Hello everybody,
 
I set up a database using the "makerea" tool (Windows XP).
 
Name: EAS
Startdate: 200701
Enddat: 201212
Creating BOTH REA and WAV folders
 
After this is done all folders are created, and I can choose the dates from the 
drop-down lists.
Then I copy&paste some S-file (say 12-1518-52L.S200808) into the 
REA/EAS__/2008/08 folder and the corresponding wave file 
(2008-08-12-1517-26S.GD____040) into WAV/EAS__/2008/08.
Now I click the "update ..." button in SeisAn, enter the name of the database, 
some operator id, press return on the lock id, enter the start and end date 
(same as above).
It generates some output
 
...
 STOP WITH STATUS= 3
 Print output in file print.out
 Summary file in hypsum.out
 Nordic in hyp.out
Stop - Program terminated.
 
Now I "refresh" the event list by changing the date and changing it back, 
select the one event (12/08/2008 15:18 52 LQ ...) and click on "Plot".
Then the console window closes, and opens a new, empty one and that's all that 
happens.
 
Am I doing anything wrong?
 
 
Kind regards
 
Maximilian Krickl
 
________________________________


Maximilian Krickl
Dipl.-Ing. (FH), Regierungsbeschäftigter
Fachbereich
Landeserdbebendienst, Beratung Untergrundgefahren

Geologischer Dienst NRW - Landesbetrieb -
De-Greiff-Str. 195
D- 47803 Krefeld

Tel.:   +49 (0) 21 51 / 897 - 502
Fax:   +49 (0) 21 51 / 987 - 505
eMail: [email protected]
Internet:         http://www.gd.nrw.de <http://www.gd.nrw.de/> 

 
_______________________________________________
seisan mailing list
[email protected]
http://mailman.uib.no/listinfo/seisan

Reply via email to