Ashley,

Tricky - but as already has been pointed out I would look at memory
first (memtest86+), though if it was a proper server, it should have
ECC memory which should minimise this risk . Power would be net on the
list - some systems have voltage monitoring you can look at - other
wise voltmeter looking for +/-5V, +/- 12V and +3.3V on the ATX
connector.

Regards, Martin
--
SLUG - Sydney Linux User's Group Mailing List - http://slug.org.au/
Subscription info and FAQs: http://slug.org.au/faq/mailinglists.html

Reply via email to