Hey guys, Do you think this is a correct behavior for Slurm (I am using 14.03) when I have 2 jobs: job1 and job2 (which depends on job1) and then prolog of the job2 is started almost at the same time as epilog of the job1?
If it is expected behavior, does anybody know how to force prolog of the job2 to wait for the finish of epilog of the job1? I believe this behavior was not the same always, so maybe there is now a way to switch the behavior back. Best regards, Taras
