Good morning everyone,

is there a way to control the order in which jobs get preempted?
That is, for a queue with PreemptMode=REQUEUE, it would make sense to 
preempt jobs first that haven't run for long; for CANCEL with some
GraceTime, perhaps addressing the longest-running jobs first would
be better - can Slurm's strategy be hinted twoards the "right" way?

Thanks,

- S

-- 
Steffen Grunewald, Cluster Administrator
Max Planck Institute for Gravitational Physics (Albert Einstein Institute)
Am M�hlenberg 1
D-14476 Potsdam-Golm
Germany
~~~
Fon: +49-331-567 7274
Fax: +49-331-567 7298
Mail: steffen.grunewald(at)aei.mpg.de
~~~

Reply via email to