All,Trying to see the best way to identify the time limit of a job from within the job.
I had hoped it was one of the SLURM variables, but apparently not.
Is there an easy way outside doing an 'squeue' or 'scontrol' call from the job to find out the max time of itself?
I hate doing RPC calls as too many of them can tip a system over. Brian Andrus