On 9/11/21 5:42 am, Loris Bennett wrote:

We just set up a reservation at a point at a time which is further in the
future than our maximum run-time.  There is then no need to drain
anything.  Short running jobs can still run right up to the reservation.

This is the same technique we use too, works well!

All the best,
Chris
--
 Chris Samuel  :  http://www.csamuel.org/  :  Berkeley, CA, USA