G'Day all, I need to replace a faulty DIMM chim in our login node so I need to stop new jobs being kicked off while letting the old ones end.
I thought I would just set all nodes to drain to stop new jobs from being kicked off... does this sound like a good idea? Down time window would be 20-30 minutes, scheduler is a separate node and I could email back any users who try to SSH while the node is down. Sid Young W: https://off-grid-engineering.com W: (personal) https://sidyoung.com/ W: (personal) https://z900collector.wordpress.com/