G'Day all,

I need to replace a faulty DIMM chim in our login node so I need to stop
new jobs being kicked off while letting the old ones end.

I thought I would just set all nodes to drain to stop new jobs from being
kicked off... does this sound like a good idea? Down time window would be
20-30 minutes, scheduler is a separate node and I could email back any
users who try to SSH while the node is down.


Sid Young
W: https://off-grid-engineering.com
W: (personal) https://sidyoung.com/
W: (personal) https://z900collector.wordpress.com/

Reply via email to