South Sudan minister reveals “ambitious” road construction plan
ArticleComments (1). Email PrintSave
--------------------------------------------------------------------------------

November 6, 2011 (KAMPALA) – A ten year road construction plan,
estimated to cost between $3—4 billion will connect the ten states of
the newly independence Republic of South Sudan, has been proposed, a
minister reveal on Saturday.


Gier Chuang Aluong (ST)Gier Chuang Aluong, South Sudan’s minister of
roads and bridges, told a student gathering in the Ugandan capital,
Kampala that the costly project will accelerate the fledgling nation’s
vision of "taking town to the people."

Responding to accusations from the students that South Sudan’s leaders
have failed to deliver basic services since they came into power after
a 2005 peace deal, the minister admitted said he is “irritated when
introduced as minister of roads and bridges” when there are no roads
and bridges in South Sudan.

South Sudan gained independence from north Sudan in July following
January referendum that was promised in the 2005 comprehensive peace
agreement (CPA) that ended two decades of north—south Sudan civil war.

Authorities often blame South Sudan’s poor road network for the slow
response of police to local tribal feuds.

“Everything is possible and all ten states will be connected. We have
made an ambitious plan of over 3,000 kilometres all over the South
[Sudan],” minister Chuang said.

In what the minister describe as draft plan for his ministry, Chuang
claims that the first national road (code named as N1) will start from
Nimule on the South Sudan—Uganda border and will connect with Renk
near South Sudan’s border with north – Sudan.

The N2 road will start from Nadapal on the South Sudan – Kenya border
and pass through Kapeota, Torit, Juba to Munduri, Rumbek, Wau and
Awiel. N2 will also connect with, Abyei, a contested territory claimed
by the south, which is currently in north Sudan.

The two roads will connect eight out of South Sudan’s 10 states.

Bentiu, the capital of Unity state, will get connected to N2 at Leer,
Mayendit to Rumbek. Yambio, the capital of Western Equatoria state
will be connected to N2 at Munduri.

Minister Chuang described building a new road network as “critical”.
He added that another road will run from Jokou, next to the Ethiopian
border, to Malakal, the headquarters of Upper Nile state.

A 70km road, according to Chuang’s plan, will connect Raat to Boma and
continue a further 320km to Bor, the capital of Jonglei state. The
Jokou – Malakal road will be connected to Unity state by a new bridge
to be built across the White Nile river.

The minister said the 3,000 km road project will cost up to $4 billion
over ten years saying that he will be proud to be the minister for
roads and bridges in three years time once construction has begun.

FUNDING TARMAC ROADS

The source of funding for the tarmac roads, which are rare in South
Sudan, remains a fundamental question. But the South Sudan minister
expressed opportunism that a combination of donor funding and credit
would allow the project to go ahead.

Considering that the government of South Sudan’s 2011 annual budget
was only $2.3 billion spending $4 billion on roads over four years is
a massive but much need investment according to the minister.

Minister Chuang says the price worth it.

“If we have the oil, should we leave it without building roads?” he
said. When South Sudan seceded from north Sudan it took with it 75% of
the country’s oil.

TAKING TO THE PEOPLE

Repeating the slogan of the John Garang, the former leader of South
Sudan’s ruling Sudan People’s Liberation Movement, Chuang said he
wanted to bring the services available in towns to people in rural and
remote areas.

Chuang warned that unless road construction is made a priority in
South Sudan towns will never reach the people because “towns will not
be loaded on trucks and transported to villages.”

“We cannot build a nation without roads and bridges. Roads are the
backbone of the development of any nation. Building roads is the only
hope,” he said.

As a former minister of internal affairs, Chuang said he had
“difficult life” responding to local conflicts in South Sudan that
have killed thousands since the 2005 peace deal.

(ST)

-- 
You received this message because you are subscribed to the Google Groups 
"South Sudan Info - The Kob" group.
To post to this group, send email to [email protected].
To unsubscribe from this group, send email to 
[email protected].
For more options, visit this group at 
http://groups.google.com/group/SouthSudanKob?hl=en.

Reply via email to