On 07/18/2012 09:49 AM, Paul Robert Marino wrote:
I have noticed that we have gone past the expected release date set
for spacewalk version 1.8 is there any updated ETA on when it it will
be released.
there are a lot of bug fixes in 1.8 that have not been back ported to
1.7 which are a show stoppers for many people. so I was wondering is
there an updated ETA? Is there a list of what still needs to be
completed? Is there a list of what needs testing so we can help
further this along?
_______________________________________________
Spacewalk-devel mailing list
Spacewalk-devel@redhat.com
https://www.redhat.com/mailman/listinfo/spacewalk-devel
I'll throw out a few things as well.
Today (announced at Summit) we are focused on a Satellite 5.5 release,
for fall 2012. As such, we have not had cycles to provide any
significant enhancements/improvements to Spacewalk to be worthy/ready
for a 1.8 release. We do have SCAP improvements, now ABRT, ARM hardware
, SuseStudio, and misc bugfixes.
But some core items such as:
- systemd (for Fedora 17)
- re-base to cobbler 2.2 (and make it work)
- or keep using an older no longer maintained upstream version
have not been tackled/resolved to make us feel comfortable in saying we
are 1.8 ready. Jan's guidance on this thread is fairly accurate.
I also have a small wish list of items I'd like to consider for
Spacewalk for 1.8, which right now, would likely not get into the release.
Cliff
_______________________________________________
Spacewalk-devel mailing list
Spacewalk-devel@redhat.com
https://www.redhat.com/mailman/listinfo/spacewalk-devel