I picked up my newly rebuilt motor today. It was wrapped up with clear plastic wrap. The old parts were in a box. I asked about the old pistons. I thought they would be worth keeping since they were going to reuse them, if I hadn't gone to standard size 9 to 1 pistons. Well they consider old pistons expendable, so I was shown a 55 gallon drum full of pistons and told they were in there. When I got home and unloaded the motor, I pulled off the plastic wrap and found they had put the engine hoist bracket and the long head studs at the front of the motor. I looked at the old parts in the box and found they had only used two of the four new stainless steel exhaust valves. Originally they said I just needed the valves ground, so I said OK, I will return these new stainless steel valves. They called me a few days later and said two of the exhaust valves were bad. They had checked out my spare head and knew I had some extra valves,but I gave them the new stainless steel exhaust valves and said put these in. They assembled and painted the motor. Now they are going to have to take it apart and put in the other two exhaust valves. They should have to provide any new gaskets, don't you think? Larry
/// [EMAIL PROTECTED] mailing list /// Send admin requests to [EMAIL PROTECTED] /// or try http://www.team.net/cgi-bin/majorcool /// Archives at http://www.team.net/archive /// Send list postings to [EMAIL PROTECTED] /// Edit your replies! If they include this trailer, they will NOT be sent.