Forum,

Scene:  School Bldg. with a ‘gathering’ hall where structural beams span N,
S, E, W – creating pockets galore.  N, S beam is 3’-5” deep from top; E, W
beam(s) are 2’-5” deep from top creating a 21’-3” x 8’-8” pocket.  So far,
no concerns…

 

The pocket has 1” x 6” Redwood ceiling panels on framing taking up 3” total
- spaced ¾” apart throughout the pockets located ‘up’ within leaving 8” of
clearance between the top of the framework and bottom of the steel channel
decking; and 1’-6” from the underside of the panels to the bottom of the E,
W beams.

 

A couple questions come to mind:

 

(1)       Would the space above be considered ‘concealed’ or a ‘combustible’
situation that would require protection?  There’s nothing up here but air
and hanging components.

(2)      Would protection be required above and below Redwood panels?

(3)      If (2)… would the ‘solder’ effect be of concern?  Granted – only ¾”
reveal between boards…

(4)      Could a sidewall be placed above panels ONLY?  (This I would think
‘no’ just because of the limited reveal space)

(5)      Could a sidewall be placed within 4” - 6” ‘beneath’ the Redwood
panels to satisfy requirements?

 

Any help or similar situations w/ outcomes would be greatly appreciated!

 

RFI Chuck

Bismarck

 


No virus found in this outgoing message.
Checked by AVG Free Edition. 
Version: 7.5.516 / Virus Database: 269.19.10/1241 - Release Date: 1/24/2008
9:58 AM
 
  
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum

To Unsubscribe, send an email to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)

Reply via email to