The ceiling temperature is the only guideline I have used in that type of situation. The plant may have info on that. There may be ways to calculate or estimate ceiling temp but I'd have to research it. Probably end up with 350+ degree heads.
The o ly thing I'd add to your wish is prompt payments. Sent from my iPhone On Dec 31, 2009, at 5:15 PM, Jay Jay Blocker <[email protected] > wrote: > I am having one of those days where I cant find the right answer. I > have a building that contains 5 large kilns for ceramics. An > inspection was done and it was discovered that all the uprights over > the top of the kiln (hung in the rafters about 14 feet above the top > of the kilns) have been removed and plugged. I see in 13 the line > about the industrial ovens but do not see a section referring me to > a requirement of specific temperature rated heads. Is the maximum > ceiling temperature the only rule to use for this problem as defined > in chapter 8? > > Have a very happy and safe new year full of accepted proposals and > easy permits. > > J. Blocker > EFPS > (303) 353-9712 > > > > _______________________________________________ > Sprinklerforum mailing list > [email protected] > http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum > > For Technical Assistance, send an email to: [email protected] > > To Unsubscribe, send an email to:Sprinklerforum- > [email protected] > (Put the word unsubscribe in the subject field) _______________________________________________ Sprinklerforum mailing list [email protected] http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum For Technical Assistance, send an email to: [email protected] To Unsubscribe, send an email to:[email protected] (Put the word unsubscribe in the subject field)
