I am not ungrateful.
yes, I missed that one, Steve.

Dooooooo....
Thank you all for edumacating me.


-----

Here is another, related question to separate sensing lines
and fire pump controllers with PRedVs.

A design team chose  to move the design ahead
with multiple large-flow PRedV stations.

Per comment from Tom Duross offered New Year's Day 2009, (paraphrased)
"...one solution to oscillations in pressure between JP controllers
and PRedVs-downstream-of-FP is  to locate the JP discharge and JP sensing
lines downstream of the PRedV."

Does it then follow if we have handfuls of large-flow PRedVs that are
downstream-of-the-FP, that we will need equally as many JPs to match
one-for-one
each PRedV, so as to provide for the solution mentioned above on January
one, 2009?
If not, can someone predict the stability of a system ;-/ with several JPs
each
discharging upstream of downstream-PRedVs.

I am following orders to work with a given design.


Scot Deal
Excelsior Fire Engineering
-------------- next part --------------
An HTML attachment was scrubbed...
URL: 
<http://fireball.firesprinkler.org/mailman/private/sprinklerforum/attachments/20110923/cd663d60/attachment.html>
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum

Reply via email to