NJ UCC code officials do not "approve" plans, they "release" plans.  Approved 
was a bad word!!

Here in Florida I have had to get used to approving plans.

Dave Herbert
Retired from State of NJ, now working in Florida
Guest

Sent from my iPad

> On Jan 20, 2014, at 4:24 PM, "Jim Davidson" 
> <[email protected]> wrote:
> 
> TO all,
> 
> If I remember correctly the permit that the trade contractor signs and 
> submits to the NJ code official (building or fire) states that the system(s) 
> are installed in accordance with the specific code enacted by the State of 
> New Jersey. No where on the permit does the permit refer to the code 
> official's approved plans. The only way to deviate from the lawful code is by 
> written permission from the code official on code official's letterhead 
> specific to the project and specific trade shop drawings. Anything else does 
> not count. Old saying "If the plan reviewer missed it, it is not a variance 
> to the code requirements.
> 
> Have a fire safe day!
> 
> Regards
> 
> Jim  
> 
> DAVIDSON ASSOCIATES
> 
> Fire Protection Engineering    P. O. Box 4010
> Code Consultants    Greenville, DE  19807-0010
> Medical Gas Systems Engineering    (302) 994-9500
>    Fax (302) 994-3414
> 
> CONFIDENTIALITY
> This report and any attachments are confidential and also may be privileged.
> If you are not the named recipient, or have otherwise received this report in 
> error, please destroy the report, notify the sender immediately, and do not 
> disclose its contents to any other person, use them for any purpose, or store 
> or copy them in any medium.
> Thank you for your cooperation.
> 
> -----Original Message-----
> From: [email protected] 
> [mailto:[email protected]] On Behalf Of John 
> Drucker - Home
> Sent: Monday, January 20, 2014 4:00 PM
> To: [email protected]
> Subject: RE: 1/2" and Seismic
> 
> Craig wrote; "I was not surprised at the first e-mail, that's what I hear all 
> the time...  "the plan reviewer approved the plans", (even though they had 
> significant technical errors)."
> 
> Craig, here's a question for ya, just finished my sixth cup......if the plan 
> reviewer approved the plans that had significant technical errors what does 
> that say about the technician who designed and the professional engineer who 
> signed em ?
> 
> .....running for cover.
> 
> John
> 
> 
> John Drucker, CET
> Assistant Construction Official
> Fire Protection Subcode Official
> Building/Fire/Electrical Inspector
> Red Bank, New Jersey
> 
> 
> 
> -----Original Message-----
> From: [email protected]
> [mailto:[email protected]] On Behalf Of 
> [email protected]
> Sent: Monday, January 20, 2014 2:45 PM
> To: [email protected]
> Subject: RE: 1/2" and Seismic
> 
> I was not surprised at the first e-mail, that's what I hear all the time...
> "the plan reviewer approved the plans", (even though they had significant 
> technical errors).
> 
> 
> Had me goin' for a minute.  
> 
> Craig L. Prahl, CET   
> Fire Protection Group Lead
> CH2MHILL
> Lockwood Greene
> 1500 International Drive
> Spartanburg, SC  29304-0491
> Direct - 864.599.4102
> Fax - 864.599.8439
> CH2MHILL Extension  74102
> [email protected]
> 
> 
> -----Original Message-----
> From: [email protected]
> [mailto:[email protected]] On Behalf Of Roland 
> Huggins
> Sent: Monday, January 20, 2014 2:39 PM
> To: [email protected]
> Subject: Re: 1/2" and Seismic
> 
> CORRECTION
> 
> that should read - an approved set of plans does NOT mean it's ok to violate
> NFPA 13.   I've gotta lay off the coffee.
> 
> Thanks John for the rapid catch and polite direct contact.
> 
> Roland
> 
> Roland Huggins, PE - VP Engineering
> American Fire Sprinkler Assn.       ---      Fire Sprinklers Saves Lives
> Dallas, TX
> http://www.firesprinkler.org
> 
> 
> 
> 
> 
> On Jan 20, 2014, at 11:33 AM, Roland Huggins <[email protected]>
> wrote:
> 
>> DOn't forget that an approved set of plans means it is ok to violate 
>> NFPA
> 13.  All an approved set of plans means is that you have permission to 
> proceed. So, even when approved, if you install it, you are responsible for
> it being right.    Now if there is an existing approved variance, all is
> golden.
>> 
>> Roland
>> 
>> 
>> Roland Huggins, PE - VP Engineering
>> American Fire Sprinkler Assn.       ---      Fire Sprinklers Saves Lives
>> Dallas, TX
>> http://www.firesprinkler.org
>> 
>> 
>> 
>> 
>> 
>>> On Jan 17, 2014, at 3:52 PM, Charles Thurston <[email protected]> wrote:
>>> 
>>> This is an existing system. 1 1/2" branch with 1/2" outlet "T"s for
> heads, They added a L/O ceiling 6" below the top of the pipe in the parking 
> deck. Now need to nipple over to a Dry Wax Over Lead (Local Ordnance) Dry 
> Head. Another contractor submitted plans, calcs and got a permit for this a 
> 1/2" Close, 1/2" x 1" 90, 1' Close nipple, 1" T with plug for the head. The 
> other contractor's foreman smarted off to one of the owners and they got 
> thrown off the site. Material is all there, Just need the labor to put it in.
> 
> _______________________________________________
> Sprinklerforum mailing list
> [email protected]
> http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
> _______________________________________________
> Sprinklerforum mailing list
> [email protected]
> http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
> 
> 
> _______________________________________________
> Sprinklerforum mailing list
> [email protected]
> http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
> 
> 
> 
> _______________________________________________
> Sprinklerforum mailing list
> [email protected]
> http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

Reply via email to