I apologize for such a simple question, but I would greatly appreciate some 
guidance: 

I have a 22,000 sqf light hazard office space with a 750 sqf mechanical room 
that I've identified as ordinary hazard 1.  The entire ceiling space is an open 
14' concrete beams and roof deck, and the mechanical room is separated by 
sheetrock and self-closing doors.  The riser is in the mechanical room and I 
have 7 upright sprinkler heads fed off the cross main pipe feeding the light 
hazard office space.  What code allows me to design this way or must I create a 
separate riser feed for each hazard? 