Yeah. Never said anything if it was a good idea. Just more of the concepts involved.

Travis Mack, SET
MFP Design, LLC
2508 E Lodgepole Drive
Gilbert, AZ 85298
480-505-9271
fax: 866-430-6107
email:[email protected]

http://www.mfpdesign.com
https://www.facebook.com/pages/MFP-Design-LLC/92218417692
Send large files to us via: https://www.hightail.com/u/MFPDesign
LinkedIn: https://www.linkedin.com/in/travismack

On 6/28/2016 8:44 AM, Vince Sabolik wrote:
.... so, what you wind up with is a .60 light hazard job!

I was told that because of expen$e, the half-foot dimensions weren't tested which
would have allowed us to use these in 14x16, etc. schemes.

Anybody else told that?


11351 Pearl Road / Strongsville, Ohio 44136Phone 440 238-4800 Fax 440 238-4876Cell 440 724-7601

/Vince Sabolik /



_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

Reply via email to