Yeah. Never said anything if it was a good idea. Just more of the
concepts involved.
Travis Mack, SET
MFP Design, LLC
2508 E Lodgepole Drive
Gilbert, AZ 85298
480-505-9271
fax: 866-430-6107
email:[email protected]
http://www.mfpdesign.com
https://www.facebook.com/pages/MFP-Design-LLC/92218417692
Send large files to us via: https://www.hightail.com/u/MFPDesign
LinkedIn: https://www.linkedin.com/in/travismack
On 6/28/2016 8:44 AM, Vince Sabolik wrote:
.... so, what you wind up with is a .60 light hazard job!
I was told that because of expen$e, the half-foot dimensions weren't
tested which
would have allowed us to use these in 14x16, etc. schemes.
Anybody else told that?
11351 Pearl Road / Strongsville, Ohio 44136Phone 440 238-4800 Fax 440
238-4876Cell 440 724-7601
/Vince Sabolik /
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org