Lol
Raleigh North Carolina

Sent from my Verizon 4G LTE Droid
On Dec 15, 2016 6:46 PM, Rocci Cetani 3 <[email protected]> wrote:
Mark where do you work? I want to make sure to avoid that jurisdiction.....

Rocci Cetani III, CET
Designer
Water-Based Fire Protections Systems Layout, Nicet Level III

Northern California Fire Protection Services Inc.
16840 Joleen Way Bldg. A
Morgan Hill, CA 93037
P-(408) 776-1580 EXT.111
F-(408) 776-1590


[email protected]
www.norcalfire.com<http://www.norcalfire.com>

CONFIDENTIALITY NOTICE: This message and any document accompanying it may
contain confidential information
belonging to the sender. The information is intended only for the use of
individual or entity named above. If you are not the intended recipient, or
the employee or agent responsible to deliver this message to the intended
recipient, you are hereby notified that any disclosure, copying or taking of
any action in reliance on the contents of this information is strictly
prohibited. If you have received this transmission in error, please
immediately notify us by telephone to arrange for return of the documents.

-----Original Message-----
From: Sprinklerforum [mailto:[email protected]]
On Behalf Of Mark Phillips
Sent: Thursday, December 15, 2016 3:34 PM
To: [email protected]
Subject: Re: Tenant improvement

Here if you add one head at all you calculate.
If you relocate any head more than five feet total including break over and
drop you calculate.
If the existing facility has a pump. You need a current a certified pump by
a manufacturer rep or sealed by a PE And you need to take it the street tie
in with a current flow test performed by a AHJ certified tester and
witnessed by the city.

We figure calculating every job so no matter what size job it's going to be
2500 out of the gate.
But it's the standard so everyone is equal.

That is as long as you read the city requirements for permitting.


Sent from my Verizon 4G LTE Droid
On Dec 15, 2016 6:12 PM, "Travis Mack, SET" <[email protected]> wrote:
How many of you are having to provide calculations when you do a tenant
remodel?  I'm not talking about changing densities or even going from
standard to extended coverage sprinklers.  I just mean your average run of
the mill add/relo project.

We have run into a fire marshal that feels it is required on all projects
now.  The one that they are currently fighting is just a tenant change in a
strip mall.  Building has been around for nearly 30 years.
Water supply in area is very stable.  Would you normally figure a full
calculation on this type of project?


--
Travis Mack, SET
MFP Design, LLC
2508 E Lodgepole Drive
Gilbert, AZ 85298
480-505-9271
fax: 866-430-6107
email:[email protected]

http://www.mfpdesign.com
https://www.facebook.com/pages/MFP-Design-LLC/92218417692
Send large files to us via: https://www.hightail.com/u/MFPDesign
LinkedIn: https://www.linkedin.com/in/travismack

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org


_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

Reply via email to