Question for all my NFPA 13 committee members (and anyone else who wants to
chime in).  We have (4) building that have had the offices and ceilings
demolished leaving it a market ready warm shell. AHJ is now stating that all
existing uprights need to be removed  and replaced with QR sprinklers.
A.8.3.3.1 states "when renovations occur in an existing building and no
changes are made in the existing sprinkler system, this section is not
intended to require the replacement of existing standard response sprinklers
with quick-response sprinklers"  does the removal of the existing drops due
to the removal of the ceiling  constitute "changes made to the existing
system" ??  My feeling is this wasn't the intent of the committee (and I'm
probably wrong)  but  I'd like to hear everyone's comments/thoughts. 

 

Thank you!!

 

Rocci Cetani III, CET

Senior Designer

Water-Based Fire Protections Systems Layout, Nicet Level III

 

Northern California Fire Protection Services Inc.

16840 Joleen Way Bldg. A

Morgan Hill, CA 93037

P-(408) 776-1580 EXT.111

F-(408) 776-1590

 

 

[email protected]

www.norcalfire.com <http://www.norcalfire.com/> 

 

CONFIDENTIALITY NOTICE: This message and any document accompanying it may
contain confidential information 

belonging to the sender. The information is intended only for the use of
individual or entity named above. If you are not the intended recipient, or
the employee or agent responsible to deliver this message to the intended
recipient, you are hereby notified that any disclosure, copying or taking of
any action in reliance on the contents of this information is strictly
prohibited. If you have received this transmission in error, please
immediately notify us by telephone to arrange for return of the documents.

 

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

Reply via email to