Are there any studies comparing the failure rates of Schedule 10 steel pipe
versus schedule 40 steel pipe used on wet water filled sprinkler systems?
I have a client who is not allowing the use of schedule 10 Main piping 2 ½
and larger on their projects. All piping used has to be schedule 40.
Thank you in advance.