> When you can, please let us know more details about the construction.


Ah....the gory details.

Design criteria was:
1) low maintenance
2) easily removed and relocated (if we move)

I initially decided on a modified PETS base with 10' minimum radii.  The 8'
aluminum box sections are supported by galv. pipe fastened to a flange and
screwed to a free standing pier block.  I used 1.25" diam. risers and a
short piece of 1" at the top for vertical adjustment.  The 1" slides inside
the larger 1.25 which is tapped for a set screw.

I originally intended to fasten 1.5 x 1.5 x .125 aluminum angle to the frame
sections, about an inch and a half from the outside edge.  One track rail
would be supported by the outside box member and the other (inside rail)
supported by this new piece of angle.  The track ties would be fastened to
the all aluminum base....thus no paint, no delamination, no maintenance.  I
purchased the angle and had the appropriate radii bent for the corners.
Looked great.  Really thought I had built a better mouse trap.

One BIG problem I didn't anticipate.  Rolling the angle into a radius put a
wow into it.  In other words, it was no longer plumb along its length which
meant I would be shimming the center of the span by over a 1/4 inch unless I
wanted a roller coaster railroad.  (The Cricket would have been fine but the
rod drivers wouldn't think this very cool.)  After rolling, it was springy
as heck so the only way to straighten it would be annealing and pressing.
Should have had it built to spec originally rather than modifying it after
the fact.  That is plainly obvious now.  Being tired of building and really
wanting to operate, I decided to cut my losses rather than mess with it any
further.

Therefore, a 1/2" ply deck now resides on top, with two coats of a green
Polyurethane non-slip "paint."  Initially, it is a waterproof barrier with
amazing adhesion, strength and supposedly UV resistant, designed for
stadiums, pool areas, factory floors, etc.  We'll see how long it holds up.
Hopefully I've got a couple of years to think on it before the ply starts to
pop apart.

I'm still after zero maintenance.  Maybe next time I'll hit the mark.  I
like the idea of half inch Trex and have also been thinking about poured
light weight concrete next time around.

Jon
 