At 11:11 AM 12/13/2002 -0600, you wrote:
>What are your actual loading gauge clearances?
>
>Mike Eorgoff
>
Mike

Arch Bridge
Side clearance is  3 5/8 inches from centerline of track
Center to center (double track) on the bridge is 6 1/4 inches
Vertical clearance is more than 5 feet (tree limbs)

Walkover
Vertical (walkover) 28 inches above railhead
Side clearance (outside passing track ONLY) 6 1/4 inches from track center
Side clearance (outside main)  12 3/4 inches

Mainline
Track centers (minimum) 6 1/2 inches
Radius 24 feet
switches #10

Yard and steaming bay switches #8 or #10

Jim Stapleton 

Reply via email to