Hi Ben,
in my experience it is not unusual that small changes in the network or
the demand lead to a total traffic breakdown which results in a vastly
increased number of simulation steps (and hence a much larger summary
file). Since teleports only occur for the first waiting vehicle on a
jammed street a small teleport threshold does not always help here.

Best regards,
Michael



Am 07.11.2015 um 18:20 schrieb Ben Postance:
> Hi
> 
> I have a simulation that usually incurs a summary file of around 4000kb.
> 
> I have made some changes to the network and now the summary files is in 
> excess of 9GB. This seems a bit of a drastic changes seeing as thought I only 
> added about 200 extra roads. My thought is that perhaps some vehicles are 
> becoming repeatedly stuck  hence the increase number of simulation steps / 
> summary file. However I have a time to teleport value of 50 so I also doubt 
> this.
> 
> 
> I am using 0.24. I believe its due to changes I made to the network and I 
> will view the simulation in the GUI to see whats occurring.
> 
> 
> But might you have any other ideas as to what might possibly cause such a 
> huge summary output?
> 
> 
> Thanks
> 
> 
> Ben
> 
> 
> 
> 
> 
> 
> Benjamin Postance
> 
> Postgraduate Researcher Student
> 
> Department of Geogrpahy
> 
> Loughborough Univeristy
> 
> 
> @benpostance
> 
> http://www.lboro.ac.uk/departments/geography/staff/postance-b.html
> 
> ------------------------------------------------------------------------------
> _______________________________________________
> sumo-user mailing list
> [email protected]
> https://lists.sourceforge.net/lists/listinfo/sumo-user
> 


------------------------------------------------------------------------------
_______________________________________________
sumo-user mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/sumo-user

Reply via email to