Hi you could tag them by surroundings and on top, with 2 circular ways tagged 
with man-made=embankment, be shure the short lines point up and down to 
eachother. Tats the way a slpe is determed in technical drwaings, the length 
and frequency of the lines is used to figure the decline, but since we only get 
short ones next to eachother let it be. Like this 
https://www.openstreetmap.org/#map=19/52.27366/4.72674  And yes youll have to 
walk it 4 times for a survey.
Greetz
_______________________________________________
Tagging mailing list
Tagging@openstreetmap.org
https://lists.openstreetmap.org/listinfo/tagging

Reply via email to