To be clear, "infrastructure" tagging as I described it doesn't necessarily 
come first, it (only) would if an existing rail line needs to be entered into 
OSM, then might be repurposed as a light_rail line.  If there is no rail to be 
repurposed, and it is brand-new-from-scratch passenger rail, skip that first 
part and wrangle when it is best to first enter "proposed," then "construction" 
and finally (as ribbons are cut), turning those infrastructure into passenger 
service lines.  For trains and light_rail/tram these are slightly different:  
for trains, you have BOTH a route=railway relation and a route=train relation, 
for light_rail, you can do it with a single relation that represents both the 
physical / infrastructure elements of the rail AND the passenger-oriented 
members of the single route=light_rail relation (like platforms and stop_area 
members).
_______________________________________________
Talk-au mailing list
Talk-au@openstreetmap.org
https://lists.openstreetmap.org/listinfo/talk-au

Reply via email to