Hi,
This is due to open on 9 December 2017. The entire railway is in place and the remaining works are things like ticket validators, signage, depot / substation works, tidying up, etc. When should the railway be changed from railway=construction to railway=tram? Stops are currently named "stop_name (November 2017)". Should this be changed to "stop_name (December 2017)". I'm going to see if I can get a trip before opening day - would anyone like to come along? Having someone with a battery powered dash cam (or two - one with / without audio) and a GPS unit would be good. Colm --------------------------------------------------------------------------------------------------------------- Never doubt that a small group of thoughtful, committed citizens can change the world. Indeed, it is the only thing that ever has. Margaret Mead _______________________________________________ Talk-ie mailing list Talk-ie@openstreetmap.org https://lists.openstreetmap.org/listinfo/talk-ie