Hi,

This is due to open on 9 December 2017. The entire railway is in place and the 
remaining works are things like ticket validators, signage, depot / substation 
works, tidying up, etc.


When should the railway be changed from railway=construction to railway=tram?

Stops are currently named "stop_name (November 2017)". Should this be changed 
to "stop_name (December 2017)".

I'm going to see if I can get a trip before opening day - would anyone like to 
come along? Having someone with a battery powered dash cam (or two - one with / 
without audio) and a GPS unit would be good.


Colm


---------------------------------------------------------------------------------------------------------------
Never doubt that a small group of thoughtful, committed citizens can change the 
world. Indeed, it is the only thing that ever has. Margaret Mead
_______________________________________________
Talk-ie mailing list
Talk-ie@openstreetmap.org
https://lists.openstreetmap.org/listinfo/talk-ie

Reply via email to