*Hello,*

* *

*Need Performance Tester with Property and Casualty experience is REQUIRED*

*Long term duration*

*Stevens Point, WI*



At a minimum candidates should have





   -     Expertise in what inputs are needed to create performance and load
   testing plans for the System Under Test. The candidate should be able
   to determine the type of tests needed, have the ability to execute
   them and be able to analyze the various performance counters to determine
   performance bottlenecks
   -     Experience should cover load/performance/stress testing in web
   applications and databases.  Knowledge of performance tools of operating
   systems and networking is important.
   -     Experience with testing external facing web applications
   -     Experience in writing/executing performance test plans
   -     Solid experience with Load Runner and  (5+ years preferred)
   -     Good communication skills, motivated and driven to complete work
   assigned and works well independently
   - The following skills will be helpful for the position, but are not
   required:
   -     Guidewire PolicyCenter experience
   -     Java development experience
   -     VB scripting and QTP experience







   - Decide whether to use internal or external resources to perform the
   tests, depending on inhouse expertise (or lack thereof)
   - Gather or elicit performance requirements (specifications) from users
   and/or business analysts
   - Develop a high-level plan (or project charter), including requirements,
   resources, timelines and milestones
   - Develop a detailed performance test plan (including detailed scenarios
   and test cases, workloads, environment info, etc)
   - Choose test tool(s)
   - Specify test data needed and charter effort (often overlooked, but
   often the death of a valid performance test)
   - Develop proof-of-concept scripts for each application/component under
   test, using chosen test tools and strategies
   - Develop detailed performance test project plan, including all
   dependencies and associated timelines
   - Install and configure injectors/controller
   - Configure the test environment (ideally identical hardware to the
   production platform), router configuration, quiet network (we don’t want
   results upset by other users), deployment of server instrumentation,
   database test sets developed, etc.
   - Execute tests – probably repeatedly (iteratively) in order to see
   whether any unaccounted for factor might affect the results
   - Analyze the results - either pass/fail, or investigation of critical
   path and recommendation of corrective action



*Send resumes to [email protected]*






-- 
R . PRADEEP KUMAR
919-290-7580

Reply via email to