POSITION 1:

 

Job Title: Essbase Resource

Location: Englewood Cliffs, NJ

Duration: 10+ Months  

Rate: $40-45/hr

 


Must have working knowledge of: 
            Excel VB 
            Report development 
  
Experience in: 
            Report development using Hyperion Essbase 
            User Guide documentation 
            UAT (User Acceptance Testing) process and test script writing 
  
Good to know: 
            Data query (using Hyperion Essbase) 
  
Primary task for the hired consultant: 
            Assist PMO in various projects 
            Perform operational support for business reporting tools
developed by Business Systems 
            Develop/ maintain reports 
            Other ad hoc projects 

 

POSITION 2:

 

Data Analyst - Openworks or R5000 experience is required  

 

Job Title: Data Analyst

Location: Houston, TX

Duration: 8-9 Weeks  

Rate: Negotiable 

 

 

FYI, Openworks is a legacy data management product from Landmark (a
Halliburton company) that is specific to oil and gas. Our project is to
upgrade to the newest Landmark technology (product) called R5000. Our
requirement is for Openworks at a minimum, with both Openworks and R5000 as
an ideal.

 

Details:

The Project: a 9 - 10 week BIS Master Plan engagement to produce the Master
Plan deliverables for an oil & gas client's upgrade to the R5000 technology

 

Data analyst role: Performs source data readiness analysis and supports the
team in production of deliverables

 

Deliverables: 

1.    Current & desired-state environment / gaps summary

An MS Word document containing both narrative and tabular information about
the current and future desired state of the client's IM architecture, with
detailed gap analysis. Generally organized as follows:

.      Information architecture

-      Alignment with business requirements

-      Data model effectiveness

-      Data consistency

-      Information quality

.      Organization architecture

-      Data stewardship

-      End-user support

-      Project governance

-      IT development

.      Technical architecture

-      Source data systems

-      Hardware configuration and scalability

-      Network configuration

-      Data delivery mechanisms

 

2.    Strawman vision presentation

A PowerPoint presentation that documents the proposed end-state vision,
strategy & roadmap. It describes the initial Master Plan approach based on
the results of the business and technical track activities. Generally
follows this structure:

.      Business need & value summary

.      Future state vision & strategy

-      Information architecture

-      Organization architecture

-      Technical architecture

.      Initial recommended roadmap & program phasing

.      Initial business justification (value statements)

 

 

3.    Master Plan

A detailed PowerPoint presentation document regarding methods, findings and
recommendations associated with the Master Plan initiative. Generally covers
the following outline:

.      Project overview

.      Current-state summary

.      Recommended long-term technical architecture

.      Technology scope and capacity requirements

.      Organization and process considerations

-      Data stewardship and governance

-      IT development and user support

-      Training

.      Identification and explanation of project phasing (roadmap)

 

4.    Executive Summary

A presentation designed to give a high-level overview of the Master Plan
process, findings and recommendations which commonly covers the following
points:

.      Master Plan initiative summary

.      User requirements summary

.      Long-term vision

-      Information architecture

-      Organization architecture

-      Technical architecture

.      Recommended initiative phasing (roadmap)

.      Potential benefits and areas of risk

.      Detailed timing and cost estimates

 

5.    Planning documents (detailed planning documents in various formats)

 

.      Project plan

-      A high-level plan for the full client R5000 Program reflecting the
general strategy and roadmap

-      A detailed project plan (at a task level of detail) for the first
phase (Phase 0) of the recommended roadmap

v  The detailed plan and estimates for Phase 1 are generated during delivery
of Phase 0

.      Project team

-      An organization diagram with supporting roles and responsibilities

.      Cost estimates & timeline

A Gantt chart explaining the estimated time and cost for the recommended
approach

 

 

 

Thanks and Regards, 

 

Amrutha 

Aim Computer Consulting 

N. Laurel Park Drive,

Suite #513, 

Livonia, MI-48152

734-591-3562 Extn.1+167

Fax: 7344182598

 <mailto:amru...@aim-cc.com> amru...@aim-cc.com

 <http://www.aim-cc.com/> www.aim-cc.com

Note: This is not an unsolicited mail. If you are not interested in
receiving our e-mails then please click "Remove"

scan0008"Arise, shine." Isaiah 60:1

"WITH GOD ALL THINGS ARE POSSIBLE" Mathew 19:26

 

<<image001.jpg>>

Reply via email to